| SUPP |
SUPPLEMENTARY FEATURES |
7FOLLOWING TEST EQUIPMENT/INSTRUMENTATION PROVISIONS SHALL BE INCLUDED; DESIGNED TO SUPPORT FUNCTIONAL REQMTS GENERATOR LOAD BANK; FUEL METERING PKG; ELECTRICALLY OPERATED FUEL SHUTOFF VALVE/FUEL FILTER; ELECTRICALLY OPERATED,PNEUMATICALLY ACTUATED START AIR VALVE; P;LUMBING FOR START AIR,UTILITY AIR,FUEL GENERATOR COOLING; AND HYDROGEN SUPPLY BOTTLE/ELECTRICALLY OPERATED HYDROGEN VALVE/UTILITY AIR VALVE FOR HYDROGEN TORCH OPERATION; JUNCTION BOX; MECHANICAL JUNCTION BOX; AND EXHAUST GAS TEMPERATURE |
| ZZZV |
FSC APPLICATION DATA |
F112-PW-100 TURBOFAN ENGINE |
| RDAL |
REFERENCE DATA AND LITERATURE |
SERD 0306 |
| AQXY |
TEST TYPE FOR WHICH DESIGNED |
DYNAMICALLY TESTING ENGINE |
| CGYD |
ENGINE MODEL TESTED |
F112-WR-100 |
| FTLD |
FUNCTIONAL DESCRIPTION |
ENSURES THAT IDENTICAL CONFIGURATION,PERFORMANCE,AND SAFETY FUNCTIONS FOR ENGINE STARTING/SHUTDOWN ARE IN PLACE AT ALL INSTALLED SITES. IT SHALL INTERFACE W/ENGINE TEST ADAPTERS THROUGH COUPLING PLATE/MOUNTING SYSTEM AND SHALL BE SECURED TO TEST CELL FLOOR |