| MATT |
MATERIAL |
PLASTIC |
| ABMK |
OVERALL WIDTH |
0.384 INCHES MINIMUM AND 0.404 INCHES MAXIMUM |
| CWXN |
DISTANCE FROM END TO FIRST CLAMPING HOLE CENTER |
0.240 INCHES MINIMUM AND 0.260 INCHES MAXIMUM |
| ABTB |
MOUNTING HOLE DIAMETER |
0.205 INCHES MINIMUM AND 0.211 INCHES MAXIMUM |
| BYGG |
BLOCK HEIGHT |
0.384 INCHES MINIMUM AND 0.404 INCHES MAXIMUM |
| CWYC |
CENTER TO CENTER DISTANCE BETWEEN FIRST AND THIRD CLAMPING HOLES |
1.301 INCHES MINIMUM AND 1.321 INCHES MAXIMUM |
| ABTJ |
MOUNTING HOLE QUANTITY |
2 |
| CWXZ |
CENTER TO CENTER DISTANCE BETWEEN FIRST AND SECOND CLAMPING HOLES |
0.614 INCHES MINIMUM AND 0.634 INCHES MAXIMUM |
| CWTD |
CLAMPING HOLE QUANTITY |
3 |
| CWWM |
CLAMPING HOLE DIAMETER |
0.382 INCHES MINIMUM SECOND HOLE AND 0.398 INCHES MAXIMUM SECOND HOLE |
| CWXC |
DISTANCE FROM END TO FIRST MOUNTING HOLE CENTER |
0.521 INCHES MINIMUM AND 0.541 INCHES MAXIMUM |
| STYL |
STYLE DESIGNATOR |
RECTANGULAR |
| AZGM |
MOUNTING FACILITY |
UNTHREADED HOLE |
| CWWM |
CLAMPING HOLE DIAMETER |
0.382 INCHES MINIMUM THIRD HOLE AND 0.398 INCHES MAXIMUM THIRD HOLE |
| CWWM |
CLAMPING HOLE DIAMETER |
0.258 INCHES MINIMUM FIRST HOLE AND 0.274 INCHES MAXIMUM FIRST HOLE |
| AXPC |
CENTER TO CENTER DISTANCE BETWEEN FIRST AND SECOND MOUNTING HOLES |
0.614 INCHES MINIMUM AND 0.634 INCHES MAXIMUM |
| ABHP |
OVERALL LENGTH |
1.864 INCHES MINIMUM AND 1.884 INCHES MAXIMUM |
| AFEC |
DISTANCE FROM CENTER OF MOUNTING HOLE TO EDGE ALONG THE WIDTH |
0.197 INCHES NOMINAL |