| CWHM |
INPUT CURRENT RATING |
0.4 DC AMPERES MINIMUM SINGLE OPERATING POWER RQMT AND 1.7 DC AMPERES MAXIMUM SINGLE OPERATING POWER RQMT |
| APPA |
OUTPUT VOLTAGE RATING |
5.0 DC VOLTS NOMINAL 1ST POWER OUTPUT |
| CWHF |
OUTPUT CONNECTION QUANTITY |
9 2ND POWER OUTPUT |
| CWGH |
OUTPUT CURRENT RATING |
0.0 DC AMPERES MINIMUM 1ST POWER OUTPUT AND 1.7 DC AMPERES MAXIMUM 1ST POWER OUTPUT |
| CWHJ |
OUTPUT CONNECTION TYPE |
SOLDER LUG 2ND POWER OUTPUT |
| ABKW |
OVERALL HEIGHT |
1.880 INCHES NOMINAL |
| AKWC |
ELECTRICAL POWER SOURCE RELATIONSHIP |
OPERATING |
| CWGH |
OUTPUT CURRENT RATING |
0.0 DC AMPERES MINIMUM 2ND POWER OUTPUT AND 10.0 DC AMPERES MAXIMUM 2ND POWER OUTPUT |
| ZZZV |
FSC APPLICATION DATA |
RECEIVER-DEMODULATOR,METEROLOGICAL |
| APNX |
INPUT VOLTAGE RATING |
103.0 DC POUNDS PER HOUR DRY SINGLE OPERATING POWER RQMT AND 126.5 DC POUNDS PER HOUR WITH RETAINING CHAIN SINGLE OPERATING POWER RQMT |
| APTQ |
INPUT FREQUENCY RATING |
47.0 HERTZ MINIMUM SINGLE OPERATING POWER RQMT AND 65.0 HERTZ MAXIMUM SINGLE OPERATING POWER RQMT |
| ABHP |
OVERALL LENGTH |
8.060 INCHES NOMINAL |
| APPA |
OUTPUT VOLTAGE RATING |
15.0 DC VOLTS NOMINAL 2ND POWER OUTPUT |
| CWHF |
OUTPUT CONNECTION QUANTITY |
2 1ST POWER OUTPUT |
| ABMK |
OVERALL WIDTH |
4.000 INCHES NOMINAL |
| CWHJ |
OUTPUT CONNECTION TYPE |
SOLDER POST 1ST POWER OUTPUT |
| CRTL |
CRITICALITY CODE JUSTIFICATION |
FEAT |
| FEAT |
SPECIAL FEATURES |
ITEMS ARE BEING CODED AS CRITICAL TO INSURE SOURCE INSPECTION WILL BE PERFORMED AT THE POINT OF MANUFACTURE, PRIOR TO MATERIAL RECEIPT BY THE US NAVY OR OTHER DOD COMPONENTS. THESE ITEMS ARE PIECE PARTS OR END ITEMS IN SUPPORT OF VITAL MILITARY HARDWARE NECESSARY TO SUSTAIN THE SUCCESSFUL MISSION OF THE SHIPS, SUBMARINES, AND SHORE STATIONS OF THE US NAVY. CRITICAL FEATURES INCLUDING, BUT NOT LIMITED TO, DIMENSIONS, TOLERANCES/CLEARANCES, ELECTRONIC CHARACTERISTICS, AND METALLURGICAL PROPERTIES WILL BESPECIFIED FOR GOVERNMENT Q AR (QUALITY ASSURANCE REPRESENTATIVES) TO INSURE THE HIGHEST POSSIBLE DEGREE OF QUALITY AND RELIABILITY OF THESE PARTS BEING DELIVERED UNDER NAVICP CONTRACTS |